Why is it so hard to keep the schedule aligned with the real project?
StructureMasonryMEP rough-inFinishesPaint
Five trades. Four levels. Follow this example to see why faster individual trades do not always make a faster project.
On a project, space is just as important as time.
Crews flow through locations, and two trades cannot work on top of each other. That is why location-based scheduling is the correct way to schedule construction.
Designed from the start with Lean Construction and the Last Planner System®
Reducing waste doesn't stop at the schedule. A fragmented system creates friction, time lost, and mistakes. Surco is the only complete construction management suite that addresses this.